1300 m² of coastal façade — six masons made it through delays and a maritime climate in six months.
Project challenges
01
Coastal climate
A seaside location places higher demands on the façade as the building's protection.
02
Delays not on our side
Delays with insulation and late material deliveries stretched out the schedule.
03
Large scope
1300 m² of façade amid interruptions demanded resilience from the team.
Our solutions
How did you respond to delays?
A crew of six masons kept up the pace and moved forward even under difficult conditions and forced pauses.
How did you ensure durability?
Quality masonry designed for the maritime climate — the façade works as reliable protection.
What was the outcome?
1300 m² completed, now protecting the house from the effects of the coast.
Result
1300 m² of completed façade — reliable protection for the house against the maritime climate, despite delays and interruptions.
1300m² of façade
6masons
6months
0reworks