Two Storeys Without a Crane
Case · BE-001 · Belgium · 2024

Two Storeys Without a Crane

Nazareth, Belgium Clinker façade 900 m²
honestlyskillfullycleanhonestlyskillfullycleanhonestlyskillfullycleanhonestlyskillfullyclean

900 m² of façade on two-storey houses — several sites at once, without a crane, delivered on time in two months.

Project challenges

01

No crane

The site operated without a tower crane — the usual accelerator for heavy stages.

02

Several sites at once

Work proceeded in parallel on several houses — requiring synchronised logistics and discipline.

03

Deadline with no margin

The client expected the entire scope in two months, with no room for downtime.

Our solutions

How did you work without a crane?
We used construction hoists built into the scaffolding. This demanded better organisation and crew endurance, but allowed us to keep going even with limited logistics.
How did you manage several sites?
Clear division of crews and a single supply rhythm. The simple geometry of the houses — square shapes and even walls — allowed us to work precisely and without complications.
Were there any delays?
No. Steady and timely material supply eliminated downtime — the entire scope was delivered on schedule with no rework.

Result

900 m² of façade across several houses completed in two months — without a crane, without delays and without rework.

900m² of façade
2months
0reworks
2crews

Gallery

Scroll →
Two Storeys Without a Crane — 1Two Storeys Without a Crane — 2Two Storeys Without a Crane — 3Two Storeys Without a Crane — 4Two Storeys Without a Crane — 5Two Storeys Without a Crane — 6Two Storeys Without a Crane — 7Two Storeys Without a Crane — 8Two Storeys Without a Crane — 9Two Storeys Without a Crane — 10Two Storeys Without a Crane — 11Two Storeys Without a Crane — 12
Project videoNazareth · Belgium