900 m² of façade on two-storey houses — several sites at once, without a crane, delivered on time in two months.
Project challenges
01
No crane
The site operated without a tower crane — the usual accelerator for heavy stages.
02
Several sites at once
Work proceeded in parallel on several houses — requiring synchronised logistics and discipline.
03
Deadline with no margin
The client expected the entire scope in two months, with no room for downtime.
Our solutions
How did you work without a crane?
We used construction hoists built into the scaffolding. This demanded better organisation and crew endurance, but allowed us to keep going even with limited logistics.
How did you manage several sites?
Clear division of crews and a single supply rhythm. The simple geometry of the houses — square shapes and even walls — allowed us to work precisely and without complications.
Were there any delays?
No. Steady and timely material supply eliminated downtime — the entire scope was delivered on schedule with no rework.
Result
900 m² of façade across several houses completed in two months — without a crane, without delays and without rework.
900m² of façade
2months
0reworks
2crews