Four Blocks Through Bad Weather
Case · BE-006 · Belgium · 2024

Four Blocks Through Bad Weather

Kallo, Belgium Clinker façade 1650 m²
honestlyskillfullycleanhonestlyskillfullycleanhonestlyskillfullycleanhonestlyskillfullyclean

1650 m², four residential blocks — a full cycle from masonry to clinker brick despite a foundation error and water on site.

Project challenges

01

Foundation error

Due to an architectural error, the slab turned out narrower than the façade design — the cladding had to extend beyond its edge.

02

Site underwater

A low-lying area: rains turned the ground into mud, and water often reached ankle height.

03

Full cycle, 4 blocks

From load-bearing masonry to façade — a large scope with a clear division of responsibility.

Our solutions

How did you solve the foundation problem?
We promptly widened the section of the foundation, onto which the clinker brick cladding was then laid — without affecting the overall schedule.
How did you work in bad weather?
We organised the process so that even in extreme conditions the pace did not drop — the crews never stopped.
How did you organise the teams?
Two parallel streams: two load-bearing masonry crews over 3 months, followed immediately by two façade crews. A clear division of work and steady logistics.

Result

A full cycle from groundworks to façade — the technical error was fixed without missing the deadline, with clean masonry across 1650 m².

1650m² of work
4blocks
4crews
3months

Gallery

Scroll →
Four Blocks Through Bad Weather — 1Four Blocks Through Bad Weather — 2Four Blocks Through Bad Weather — 3Four Blocks Through Bad Weather — 4Four Blocks Through Bad Weather — 5Four Blocks Through Bad Weather — 6Four Blocks Through Bad Weather — 7Four Blocks Through Bad Weather — 8Four Blocks Through Bad Weather — 9Four Blocks Through Bad Weather — 10Four Blocks Through Bad Weather — 11Four Blocks Through Bad Weather — 12
Project videoKallo · Belgium